Thursday, September 11, 2025
spot_img
HomeEnvironmentLoma Linda University FMC powers up with monster 2-Megawatt microgrid

Loma Linda University FMC powers up with monster 2-Megawatt microgrid

A renewable microgrid energy system is now supporting the electricity needs of Loma Linda University Faculty Medical Clinics (FMC). The new system generates two megawatts of clean, reliable solar energy onsite and includes a battery storage system.

 Fully operational since August 22, the project delivers significant energy cost savings and operating resilience while also reducing the FMC’s power-related environmental impact.

The new system comes online after three years of planning and 18 months of construction. Power is generated by 3,622 solar panels installed on the top level of the P4 parking garage and above the ground-level physician parking, providing shaded parking.

A 1-megawatt Tesla battery on the building’s south side stores excess power and can provide six hours of emergency back-up power. The system also supports 10 electric vehicle charging stations located on the FMC’s west side parking lot. Renewable Energy Partners (REP) of Corona, CA, who built the array will also facilitate its maintenance going forward.

Electricity needs per day

FMC operations use an average of 1.7 megawatts of electricity per day, with usage reaching more than 2 megawatts during the peak summer months. The microgrid will provide 87 percent of the necessary power during peak needs, with the remainder purchased from Southern California Edison.

Cost savings with the microgrid system are achieved as the FMC more efficiently manages its energy source, allowing for more precise budget planning for energy costs in both the short and long term.

The current baseline cost for power purchased from Southern California Edison is 17 cents per kilowatt hour, rising to 24 cents at peak times. The FMC has contracted with the microgrid’s supplying company to pay 15 cents per hour for the next 30 years.

At current rates, the FMC will achieve $500,000 in annual savings. With power projected to reach 30 cents per kilowatt hour during the contract, annual savings could reach as much as $1.5 million.

“Our solar panel infrastructure strengthens our ability to care for the community, even during emergencies,” said Ricardo Peverini, president of the Loma Linda University Faculty Medical Group.

“It reduces our environmental footprint, makes our operations more resilient, and saves resources that we can reinvest into patient care. It’s a healthier future for our patients, our staff, and our region.” 

Loma Linda
Loma Linda
Loma Linda University Health includes Loma Linda University's eight professional schools, Loma Linda University Medical Center's six hospitals — including The Dennis and Carol Troesh Medical Campus, which opened in August 2021, housing the new adult hospital and Children’s Hospital expansion — and more than 1,000 faculty physicians located in the Inland Empire of Southern California. Established in 1905, Loma Linda University Health is a global leader in education, research and clinical care. It offers over 100 academic programs and provides quality health care to over 40,000 inpatients and 1.5 million outpatients each year. A Seventh-day Adventist organization, Loma Linda University Health is a faith-based health system with a mission "to continue the teaching and healing ministry of Jesus Christ."
RELATED ARTICLES

Sign up to our newsletter

For the latest in news, recipes and alerts be sure to sign up to our newsletter to stay up to date.

Most Popular

Subscribe To Our Newsletter

Subscribe To Our Newsletter

Join our fortnightly mailing list to receive the latest updates on plant-based evidence, recipes and opinions straight to your mailbox. 

You have Successfully Subscribed!